If it is not in a catalogue, send the drawing. Tooling, samples and production are quoted together, so the full cost is visible before the first part is made.
A special fastener is a small engineering project. The drawing has to be read for function, not only for dimensions — a radius that looks cosmetic may be there to stop a crack, and a tolerance that looks tight may not need to be.
We cold head, hot forge, machine and stamp bolts, studs, weld parts and small assemblies in carbon, alloy and stainless steel, plus brass and aluminium where the application calls for it. Before tooling is cut we review the drawing and tell you where a standard part or a small change would reduce cost — many specials start life as a modified socket screw or a cut threaded stud. The standard families remain in the product range for comparison.
| Process | Cold heading, hot forging, CNC turning, stamping |
|---|---|
| Material | Carbon, alloy, stainless, brass, aluminium |
| Size | M3 – M48, or dimensioned from your drawing |
| Tolerance | ISO 2768-m / -f, or the tolerance on the drawing |
| MOQ | From 5,000 pcs depending on size and process |
| Tooling / production | 7 – 15 days tooling, then 25 – 35 days production |


The table shows the part families we produce most often. Dimensions, material and finish come from the drawing; the process column is our recommendation for that shape.
| Size | Standard | Material & Class | Finish | Remarks |
|---|---|---|---|---|
| M8 – M24 | To drawing, ISO metric | Carbon steel 8.8 | Zinc plated, HDG | Special hex head with customer marking |
| M6 – M20 | To drawing | Carbon steel 8.8 / 10.9 | Zinc flake | Flange bolt, serrated or plain flange |
| M5 – M20 | To drawing | Alloy steel 12.9 | Black oxide | Drilled head or cross hole for lock wire |
| M6 – M16 | To drawing | Carbon steel 4.8 | Plain, copper washed | Weld stud for projection welding |
| M8 – M24 | To drawing | Carbon steel 4.8 / 8.8 | Hot-dip galvanized | U-bolt with two nuts and washers |
| M8 – M30 | To drawing | Carbon steel 4.8 / 8.8 | Hot-dip galvanized | Forged eye bolt, proof load on request |
| M10 – M30 | To drawing | Carbon steel 8.8 | Hot-dip galvanized | T-head bolt for machine table slots |
| M10 – M36 | To drawing | Carbon steel 4.8 / 8.8 | Plain, HDG | Square head bolt for older machinery |
| M5 – M20 | To drawing | Alloy steel 12.9 | Black oxide | Shoulder bolt, ground shoulder |
| M12 – M24 | To drawing | Carbon steel 8.8 | Hot-dip galvanized | Step bolt for pole line hardware |
| M12 – M36 | To drawing | Carbon steel 4.8 / 8.8 | Hot-dip galvanized | Anchor bolt, L or J end |
| M8 – M24 | To drawing, DIN 939 | Carbon steel 8.8, B7 | Plain, HDG | Double end stud, thread lengths per drawing |
| M6 – M16 | To drawing | Stainless A2-70 / A4-80 | Plain, passivated | Machined from bar, small quantities accepted |
| To drawing | To drawing | Brass, aluminium | Plain, nickel plated | Non-ferrous parts, turned or stamped |
On a special part, substituting material changes the tooling, the heat treatment and the plating. We do not do it without telling you in writing.
Most disputes on special parts come from one of two things: a dimension that was assumed, or a sample that was approved informally. Both are closed before production.
For cold-headed specials the usual starting point is 5,000 pieces per size, with tooling charged once. Larger parts above M24, machined stainless parts and small turned components are quoted individually and the MOQ may be lower. Send the drawing with an annual and a first-order quantity, and the MOQ will be stated on the quotation.
The tooling is paid for once by the buyer as a separate line on the quotation, and it is kept for that part only. We do not run your tooling for another customer. If production is interrupted for a long period, tell us before the next order so we can inspect the tool and confirm it is still fit for use.
PDF is enough for quotation; STEP or DWG helps if the part is complex. Send it through the contact page or by email to [email protected]. We will sign a mutual non-disclosure agreement before drawings are shared if your company requires one — ask for it in the first message so it does not hold up the review.
Tooling, sample and production price in one reply, with the material and process we recommend. If a standard part will do the job, we will say so.