Quality Control

A fastener that passes incoming inspection and fails in service is the most expensive kind. Our control plan is built around the checks that predict field failures — dimensions, thread fit, hardness, coating thickness and, on request, torque coefficient.

Certificate policy

We only publish what we can hand you on paper

This website does not display ISO 9001, ISO 14001, EN 14399 / EN 15048 factory production control or CE marking, because we do not hold those certificates. If your tender or your customer's specification requires them, tell us at enquiry stage — we will confirm in writing what we can and cannot supply before you build a quotation on it.

What we do supply is lot-level inspection data: dimensional reports, hardness and mechanical test results from an accredited third-party laboratory, coating thickness and salt spray reports, and mill certificates for the steel.

Inspection scope

What is checked on every order

Three groups of checks, in the order they happen on the floor.

Dimensions

Thread go / no-go gauging, major diameter, head across flats, head height, length and thread run-out — measured with calibrated calipers, micrometers and thread gauges against the drawing or standard.

Appearance

Head marking legibility, burrs, cracks after heading, plating uniformity and colour, and thread damage from handling. 100% visual sorting on critical orders, AQL sampling otherwise.

Mechanical

Hardness, proof load, tensile and wedge tensile testing — carried out by an accredited third-party laboratory, with the report issued in that laboratory's name so your customer can verify it independently.

Process control

Six checkpoints on every lot

01 — Incoming wireChemistry and diameter confirmed against the mill certificate before heading
02 — Cold headingFirst-off approval by sample, then hourly dimensional checks
03 — ThreadingGo / no-go gauge check and thread length verification every batch
04 — Heat treatmentBatch records retained; hardness and decarburization sampled per batch
05 — Plating / coatingCoating thickness measured, adhesion checked, embrittlement relief on high-strength parts
06 — Pre-shipmentAQL sampling to ISO 2859-1, plus 100% visual sorting where you ask for it
Third-party inspection

Inspect the lot before it leaves China

You are not expected to take our word for a container. Any recognised inspection company can be appointed at your cost, and we will give them access to the finished goods, the packing area and the documents they ask for.

  • SGS, Bureau Veritas, TÜV, Intertek or your own QC team
  • Inspection arranged on finished goods, before loading
  • Video walkthrough of the lot if you cannot travel
  • Factory visit welcome — tell us the checklist you want to run
Commercial invoiceYes
Packing listYes, with lot numbers
Mill certificateEN 10204 3.1 on request
Dimensional reportPer lot, measured values
Mechanical test reportThird-party lab, on request
Salt spray reportOn request, 96 – 720 hours
Third-party inspectionBuyer nominated, buyer paid
Hot-dip galvanized hex nuts with lot marking
Traceability

Every carton can be traced back to the wire coil

Each production lot is marked with a lot number and a heat number. That record links the finished part to the steel mill certificate, the heat treatment batch and the plating run — so if something is questioned a year later, we can go back to the source.

  • Lot and heat number marked on carton and on the packing list
  • Material certificate traceable to the steel heat
  • Inspection report with measured values, not just pass / fail
  • Retained samples kept after shipment for dispute resolution

Want to audit us before ordering?

We welcome factory audits and third-party inspection. Send us your checklist and we will confirm what we can show you, and arrange a date.

WhatsApp